Page 10 of 15
Posted: Thu Mar 02, 2006 1:47 pm
by 2005
As far as I understood their was no simple way to calculate the ram divider shit. When the time comes Ill ask on THG, their are alot of posters who really know their shit when it comes to this kind of stuff.
But for me I know that opty will need to be atleast 2.5ghz and should be stable at 2.7 on air with slight voltage increases.
As far as the ram, the point was being able to not have to run a divider.. because that makes things easier. I could care less if its at 250 or at 290 as long as its stable. DDR is so bandwidth limited anyhow that such a modest OC in clock frequency will do very little good.
Posted: Tue Mar 14, 2006 9:17 pm
by 2005
New compy is like 1900$ with shipping (whores get like 100$ shipping).
But added Zalman 9500
Upgraded from 250GB HDD to 320GB HDD (for 25$)
Upgraded to a 500W PSU /w Active PFC
Posted: Tue Mar 14, 2006 10:11 pm
by palmboy5
consider the arctic cooling freezer pro 64, half the price of the 9500, a little "worse" than 9500.
Posted: Fri Mar 31, 2006 7:25 pm
by 2005
Well I've just deposited the money into my mothers checking account and I will be placing the order monday. The stuff should be here wednesday or so. A fully completed updated list:
HDD
Western Digital Caviar SE16 WD3200KS 320GB 7200 RPM SATA 3.0Gb/s Hard Drive - OEM
DISPLAY
ViewSonic G90FB Black 19" CRT Monitor 15-pin mini D-sub - Retail
MOTHERBOARD
DFI LANPARTY UT nF4 Ultra-D Socket 939 NVIDIA nForce4 Ultra ATX AMD Motherboard - Retail
VGA
SAPPHIRE 100134SR Radeon X1800XT 512MB GDDR3 PCI Express x16 Video Card - Retail
PSU
ENERMAX Liberty ELT500AWT ATX12V 500W Power Supply - Retail
AFTERMARKET CPU COOLER
ARCTIC COOLING Freezer 64 Pro Cooling Fan with Heatsink - Retail
WIRELESS MOUSE
Logitech G7 931375-0403 2-Tone 6 Buttons 1x Wheel USB RF Laser Mouse - Retail
THERMAL COMPOUND
ARCTIC COOLING MX-1 Thermal Compound - Retail
MEMORY
G.SKILL 2GB (2 x 1GB) 184-Pin DDR SDRAM DDR 400 (PC 3200) Unbuffered Dual Channel Kit System Memory Model F1-3200PHU2-2GBNS - Retail
CPU
AMD Opteron 165 Denmark 1GHz HT Socket 939 Dual Core Processor Model OSA165CDBOX - Retail
OS
Microsoft Windows XP Professional With SP2 - OEM
CASE
Antec Performance I P180 Silver 0.8mm cold rolled steel for durability through the majority of chassis, 1.0mm cold rolled steel around the 4x HDD area ATX Mid Tower Computer Case - Retail
TOTAL: 1,751$
TOTAL with 3 day UPS shipping: $1,845.95
The HDD has gone from 125$ to 140$ over the last week and the X1800XT 512 has gone up 10$ as well.
But it looks final to me, unless I discover any problems over the weekend
Posted: Fri Mar 31, 2006 7:28 pm
by I7Iz490N
lol
Posted: Fri Mar 31, 2006 7:37 pm
by 2005
Just out of curiosity, which aspects are better about yours and mine. Do you have like a review site similar to steves digicam for montiors???
Posted: Fri Mar 31, 2006 7:39 pm
by I7Iz490N
lol
Posted: Fri Mar 31, 2006 7:43 pm
by palmboy5
yeah theyre both viewsonic anyway, just look at the specs
if you're getting that HD for its SATA II, dont. its saying something when the 150GB Raptor uses SATA I. actually i think all raptors are SATA I, raptor or not, NOTHING can take advantage of SATA II
Posted: Mon Apr 03, 2006 7:44 pm
by 2005
This is so fucken gay
I deposited 1900$ USD into my mothers bank account at 4:45 PM EST last friday. The money is still not showing as available as of 6 PM EST today. This means that IF the money shows tommorow and it only takes one day to process my order Ill have my stuff friday. If it takes more the one day to process or for whatever retarded reason its still not showing up on the account tommorow I wont have my stuff until next monday and I will go out of my fucken mind horribly board over the weekend T_T T_T T_T
Posted: Tue Apr 04, 2006 12:35 am
by I7Iz490N
lol
Posted: Tue Apr 04, 2006 12:42 pm
by 2005
Ordered today
I paided the extra 7$ for it to be 2 day UPS instead of 3 day UPS. I figured that way theirs a ray of hope I'll get my stuff before monday. If if the order processes today and ships tommorow then I should get it thursday.
Whats retarded is that the monitor and case are comming from NJ which is like easy 1 day shipping from PA. The other shit is comming from CA so their going to have to like air mail it to get it here in 2 days. Unless they have mad man drivers that driver 8 hours straight.
Posted: Tue Apr 04, 2006 4:19 pm
by palmboy5
omg. fuck UPS. lol no i dont think theyre gonna put it on air, youll just have to live with it coming later than what you PAID for... fucking UPS, i still have no idea how two packages were shipped from two warehouses with addresses 1 away from each other, one went to like St. Louis, the other went to Texas, one came in 4 days the other came in 3. i chose 3 day shipping.. im using fedex from now on..
Posted: Tue Apr 04, 2006 6:38 pm
by I7Iz490N
lol
Posted: Tue Apr 04, 2006 8:39 pm
by 2005
Also paid the extra 3$ to upgrade my enermax to a 535W model (35 more W lol) but it had no modular cable support which I've read is a must with the P-180 due to the PSU being at the bottom and not the top like most cases.
Its been at step 1 all fucken day, im getting pissed here. And I will be calling/chatting online and bitching them out if my shit doesnt get here in 2 days. I paid for it, I want it. Fuckers
Posted: Tue Apr 04, 2006 8:43 pm
by I7Iz490N
lol